ER

Mechanical Engineer

Erm Placement Services
Kolkata8-13 LPA Posted 9 Sept 2025
FULL TIME
3d Modelling
Project Monitoring
Vendor Management

Job Description

JOB DESCRIPTION

  • Planning and preparation of Equipment Layouts ,process ducting.
  • Planning and preparation of Material Handling Equipment Layout
  • Planning and preparation of General Arrangement Drawing of Tanks, vessels Data sheet for Material Handling Equipment.
  • Planning and preparation of Piping Layout drawings in 2D ,3D drawings
  • Preparation of Isometric/ Orthographic Drawing.
  • Preparation and checking of Bill of material of piping , valves etc
  • Preparation and checking of pipe Support Detail.
  • Prepare and review 3D Modelling
  • Preparation of specification of Mechanical Equipment
  • Preparation of specification related items on piping, valves etc.
  • Checking of vendors drawings and documents
  • Maintain documentation of Mechanical department for project monitoring

Join WhatsApp Channel